Customer required a Low volume, proof of concept part that could be manufactured in a short time frame and also within a tight budget
Solution
Our team decided to use soft steel for the job and managed to design, manufacture and qualify the mould in house within 3 weeks.
Result
Our client was able to successfully approve his product with his customer and win the project. Delivering on time was a key aspect that was taken into consideration
Tech Plaastic Team
Case Studies
The team at TPI decided to move away from manual gate removal and setup a semi-automated system that precisely de-gates the components.